Construction of a 105MW Power Plant in Ndola, Zambia

BSL Infrastructure was contracted by Ndola Energy Company Limited to construct part of the 105MW Heavy Fuel Oil (HFO) operated power plant in Ndola, Zambia. The power plant was constructed in two phases with phase one being commissioned in 2013 while Phase two was commissioned in 2017.

 

The scope of work included:

  • HFO Engine hall
  • Exhaust pipes stack for the Engines
  • Radiator Platforms and Radiators
  • Thermal Insulation Works
  • Electrical Equipment Building
  • Workshop Building
  • Step up Transformer
  • GIS Building
  • Fuel storage Tanks
  • Firefighting Systems
  • Drive way and parking
  • Fencing
  • Access roads as well as the storm water drainage systems